The first of four projects creates the foundation for campus infrastructure, campus open space and classrooms. The 46-acre, 100-foot deep former pumice mine has been reclaimed through the processing and moving of pumice and landfill material. The material was innovatively recycled on site through the blending of landfill material, landfill cover soil and material from the pumice mine for a suitable engineered fill, raising the mine up to 40-feet in some areas and establishing rough grades for the future campus projects. More information here.